Reactor Engineering Works

A larger facility with dedicated enrichment pre-processing and superconductor integration stages, cutting production time substantially while maintaining structural and thermal integrity.
Level2
Build Cost5,179,000 cr
Build Time410s
Labor38
Power Draw2
Life Support Draw1
Fission AssemblyReactorEngineering WorksNuclearManufacturingPlantStellar PowerGeneration Complex
OutputBuild Station Reactor
Crafting Time555s
ItemQuantity
Durasteel Plate10
Enriched Uranium Rod4
Power Cell4
Superconductor6
ItemQuantity
Station Reactor1
MaterialQuantity
Steel Plate10300
Copper Piping5150
Structural Frame3950
Control Node1200
Processing Core2500
Sensor Array2400
View JSON Data
[{"item_id":"aluminum_ore","quantity":49550},{"item_id":"copper_ore","quantity":48750},{"item_id":"energy_crystal","quantity":4800},{"item_id":"fluorine_gas","quantity":16100},{"item_id":"gold_ore","quantity":2400},{"item_id":"iron_ore","quantity":81350},{"item_id":"krypton_gas","quantity":4800},{"item_id":"neon_gas","quantity":4800},{"item_id":"nickel_ore","quantity":7900},{"item_id":"palladium_ore","quantity":2400},{"item_id":"platinum_ore","quantity":5000},{"item_id":"silicon_ore","quantity":39400},{"item_id":"silver_ore","quantity":2400},{"item_id":"titanium_ore","quantity":16100},{"item_id":"tungsten_ore","quantity":55250}]