Modular Hangar Bay Production Plant

An expanded facility with parallel hull plating stations, dedicated docking ring installation, and structural frame integration. Improved workflow and material staging enable faster assembly of these substantial ship-storage modules.
Level2
Build Cost2,858,000 cr
Build Time250s
Labor80
Power Draw2
Life Support Draw1
Hangar Bay ModuleAssembly LineModular Hangar BayProduction PlantAutomated HangarBay WorksState-of-the-ArtHangar BayFabricationComplex
OutputBuild Hangar Bay Module
Crafting Time150s
ItemQuantity
Circuit Board6
Docking Ring2
Life Support Unit1
Steel Plate15
Titanium Alloy8
ItemQuantity
Hangar Bay Module1
MaterialQuantity
Steel Plate5950
Copper Piping2900
Structural Frame2350
Control Node650
Hull Plating2150
Reinforced Bulkhead1300
View JSON Data
[{"item_id":"aluminum_ore","quantity":148050},{"item_id":"copper_ore","quantity":25400},{"item_id":"fluorine_gas","quantity":650},{"item_id":"gold_ore","quantity":1300},{"item_id":"iron_ore","quantity":102050},{"item_id":"nickel_ore","quantity":4700},{"item_id":"silicon_ore","quantity":10050},{"item_id":"silver_ore","quantity":1300},{"item_id":"titanium_ore","quantity":24900},{"item_id":"tungsten_ore","quantity":65550}]