Automated Hangar Bay Works
Heavy industrial-scale production with integrated docking ring assembly, automated hull plating installation, and reinforced bulkhead fabrication. Robotic welding, structural validation, and parallel assembly stages handle large-volume hangar module construction.
Stats
| Level | 3 |
| Build Cost | 9,077,000 cr |
| Build Time | 330s |
| Labor | 140 |
| Power Draw | 4 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Build Hangar Bay Module |
| Crafting Time | 150s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Circuit Board | 6 |
| Docking Ring | 2 |
| Life Support Unit | 1 |
| Steel Plate | 15 |
| Titanium Alloy | 8 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Hangar Bay Module | 1 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 5400 |
| Copper Piping | 2700 |
| Reinforced Frame | 1600 |
| Control Node | 850 |
| Hull Plating | 4050 |
| Reinforced Bulkhead | 2750 |
| Docking Ring | 1250 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 468200 |
| Carbon Ore | 28800 |
| Copper Ore | 33200 |
| Fluorine Gas | 9600 |
| Gold Ore | 1700 |
| Iron Ore | 295900 |
| Lead Ore | 2500 |
| Nickel Ore | 116900 |
| Nitrogen Ice | 2500 |
| Silicon Ore | 19900 |
| Silver Ore | 1700 |
| Titanium Ore | 71100 |
| Tungsten Ore | 178050 |
| Uranium Ore | 10000 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":468200},{"item_id":"carbon_ore","quantity":28800},{"item_id":"copper_ore","quantity":33200},{"item_id":"fluorine_gas","quantity":9600},{"item_id":"gold_ore","quantity":1700},{"item_id":"iron_ore","quantity":295900},{"item_id":"lead_ore","quantity":2500},{"item_id":"nickel_ore","quantity":116900},{"item_id":"nitrogen_ice","quantity":2500},{"item_id":"silicon_ore","quantity":19900},{"item_id":"silver_ore","quantity":1700},{"item_id":"titanium_ore","quantity":71100},{"item_id":"tungsten_ore","quantity":178050},{"item_id":"uranium_ore","quantity":10000}]