Mega-Miner Manufacturing Plant
An expanded facility with dedicated neutronium-handling stations and modular strip-miner integration, accelerating base-unit enhancement while maintaining structural integrity under extreme operational loads.
Stats
| Level | 2 |
| Build Cost | 5,438,000 cr |
| Build Time | 250s |
| Labor | 20 |
| Power Draw | 2 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Build Strip Miner II |
| Crafting Time | 270s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Focused Crystal | 6 |
| Neutronium Ingot | 2 |
| Power Core | 3 |
| Stabilized Exotic | 2 |
| Strip Miner I | 1 |
| Superconductor | 4 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Strip Miner II | 1 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 10400 |
| Copper Piping | 4850 |
| Structural Frame | 3500 |
| Control Node | 1300 |
| Processing Core | 2500 |
| Sensor Array | 2500 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 47600 |
| Copper Ore | 45750 |
| Energy Crystal | 5000 |
| Fluorine Gas | 16300 |
| Gold Ore | 2600 |
| Iron Ore | 76950 |
| Krypton Gas | 5000 |
| Neon Gas | 5000 |
| Nickel Ore | 7000 |
| Palladium Ore | 2500 |
| Platinum Ore | 5000 |
| Silicon Ore | 37800 |
| Silver Ore | 2600 |
| Titanium Ore | 16300 |
| Tungsten Ore | 52550 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":47600},{"item_id":"copper_ore","quantity":45750},{"item_id":"energy_crystal","quantity":5000},{"item_id":"fluorine_gas","quantity":16300},{"item_id":"gold_ore","quantity":2600},{"item_id":"iron_ore","quantity":76950},{"item_id":"krypton_gas","quantity":5000},{"item_id":"neon_gas","quantity":5000},{"item_id":"nickel_ore","quantity":7000},{"item_id":"palladium_ore","quantity":2500},{"item_id":"platinum_ore","quantity":5000},{"item_id":"silicon_ore","quantity":37800},{"item_id":"silver_ore","quantity":2600},{"item_id":"titanium_ore","quantity":16300},{"item_id":"tungsten_ore","quantity":52550}]