Advanced Mining Module Line

A specialized production facility assembling strip-miner-I base units with additional focused crystals, neutronium ingots, and stabilized-exotic materials for mega-scale extraction. Handles the complex layering of extraction-optimization subsystems.
Level1
Build Cost1,765,000 cr
Build Time170s
Labor10
Power Draw1
Life Support Draw1
Advanced MiningModule LineMega-MinerManufacturingPlantIndustrial StripMiner WorksMega-MinerProduction Complex
OutputBuild Strip Miner II
Crafting Time270s
ItemQuantity
Focused Crystal6
Neutronium Ingot2
Power Core3
Stabilized Exotic2
Strip Miner I1
Superconductor4
ItemQuantity
Strip Miner II1
MaterialQuantity
Steel Plate8950
Copper Piping3200
Control Node850
Processing Core800
Sensor Array800
View JSON Data
[{"item_id":"aluminum_ore","quantity":10500},{"item_id":"copper_ore","quantity":14600},{"item_id":"energy_crystal","quantity":1600},{"item_id":"fluorine_gas","quantity":5650},{"item_id":"gold_ore","quantity":1700},{"item_id":"iron_ore","quantity":26750},{"item_id":"krypton_gas","quantity":1600},{"item_id":"neon_gas","quantity":1600},{"item_id":"palladium_ore","quantity":800},{"item_id":"platinum_ore","quantity":1600},{"item_id":"silicon_ore","quantity":8050},{"item_id":"silver_ore","quantity":1700},{"item_id":"titanium_ore","quantity":5650},{"item_id":"tungsten_ore","quantity":17800}]