Life Support Production Works

Heavy-duty plant with reinforced frames supporting simultaneous assembly of multiple array sections and automated docking-ring integration. Hull-plating and bulkhead stations operate in parallel to maximize throughput.
Level3
Build Cost1,330,000 cr
Build Time330s
Labor42
Power Draw4
Life Support Draw1
Life SupportAssembly LineEnvironmentalSystems PlantLife SupportProduction WorksAdvanced LifeSupport Facility
OutputBuild Life Support Array
Crafting Time18s
ItemQuantity
Life Support Unit1
Pressure Seal3
Water Recycler1
ItemQuantity
Life Support Array1
MaterialQuantity
Steel Plate650
Copper Piping350
Reinforced Frame200
Control Node100
Hull Plating500
Reinforced Bulkhead300
Docking Ring150
View JSON Data
[{"item_id":"aluminum_ore","quantity":54100},{"item_id":"carbon_ore","quantity":3600},{"item_id":"copper_ore","quantity":4150},{"item_id":"fluorine_gas","quantity":1150},{"item_id":"gold_ore","quantity":200},{"item_id":"iron_ore","quantity":35100},{"item_id":"lead_ore","quantity":300},{"item_id":"nickel_ore","quantity":14300},{"item_id":"nitrogen_ice","quantity":300},{"item_id":"silicon_ore","quantity":2450},{"item_id":"silver_ore","quantity":200},{"item_id":"titanium_ore","quantity":8050},{"item_id":"tungsten_ore","quantity":20950},{"item_id":"uranium_ore","quantity":1200}]