Environmental Systems Plant

Larger facility with reinforced bulkhead installation bays and pressure-seal automation. Structural frames support integrated testing stations that verify recycling loops before shipment.
Level2
Build Cost418,000 cr
Build Time250s
Labor24
Power Draw2
Life Support Draw1
Life SupportAssembly LineEnvironmentalSystems PlantLife SupportProduction WorksAdvanced LifeSupport Facility
OutputBuild Life Support Array
Crafting Time18s
ItemQuantity
Life Support Unit1
Pressure Seal3
Water Recycler1
ItemQuantity
Life Support Array1
MaterialQuantity
Steel Plate750
Copper Piping350
Structural Frame250
Control Node100
Hull Plating250
Reinforced Bulkhead150
View JSON Data
[{"item_id":"aluminum_ore","quantity":17050},{"item_id":"copper_ore","quantity":2950},{"item_id":"fluorine_gas","quantity":100},{"item_id":"gold_ore","quantity":200},{"item_id":"iron_ore","quantity":11750},{"item_id":"nickel_ore","quantity":500},{"item_id":"silicon_ore","quantity":1100},{"item_id":"silver_ore","quantity":200},{"item_id":"titanium_ore","quantity":2900},{"item_id":"tungsten_ore","quantity":7550}]