Industrial Lining Works

Heavy-duty production complex running continuous coating cycles across multiple parallel lines with real-time quality control. Coolant circulation prevents thermal degradation of delicate fluorine compounds during accelerated processing.
Level3
Build Cost1,169,000 cr
Build Time330s
Labor24
Power Draw4
Life Support Draw1
Chemical LinerCoating LineAutomated LiningPlantIndustrial LiningWorksHigh-ThroughputCoating Facility
OutputFabricate Chemical Liner
Crafting Time10.8s
ItemQuantity
Chlorine Compound4
Copper Piping2
Fluorine Etchant1
Reinforced Glass2
ItemQuantity
Chemical Liner2
MaterialQuantity
Steel Plate2450
Copper Piping1400
Reinforced Frame900
Control Node450
Coolant Loop700
View JSON Data
[{"item_id":"aluminum_ore","quantity":31500},{"item_id":"carbon_ore","quantity":16200},{"item_id":"copper_ore","quantity":23100},{"item_id":"fluorine_gas","quantity":450},{"item_id":"gold_ore","quantity":900},{"item_id":"helium_ice","quantity":1400},{"item_id":"iron_ore","quantity":52050},{"item_id":"nickel_ore","quantity":30600},{"item_id":"nitrogen_ice","quantity":2800},{"item_id":"silicon_ore","quantity":7650},{"item_id":"silver_ore","quantity":900},{"item_id":"titanium_ore","quantity":2250},{"item_id":"tungsten_ore","quantity":29800},{"item_id":"water_ice","quantity":1400}]