High-Throughput Coating Facility

State-of-the-art automated plant with redundant application systems and advanced coolant management. Maintains precise chemical ratios and temperature profiles to produce chemically inert linings at maximum velocity.
Level4
Build Cost3,226,000 cr
Build Time420s
Labor35
Power Draw6
Life Support Draw1
Chemical LinerCoating LineAutomated LiningPlantIndustrial LiningWorksHigh-ThroughputCoating Facility
OutputFabricate Chemical Liner
Crafting Time10.8s
ItemQuantity
Chlorine Compound4
Copper Piping2
Fluorine Etchant1
Reinforced Glass2
ItemQuantity
Chemical Liner2
MaterialQuantity
Steel Plate4150
Copper Piping2750
Reinforced Frame2550
Control Node800
Coolant Loop2450
View JSON Data
[{"item_id":"aluminum_ore","quantity":88300},{"item_id":"carbon_ore","quantity":45900},{"item_id":"copper_ore","quantity":64100},{"item_id":"fluorine_gas","quantity":800},{"item_id":"gold_ore","quantity":1600},{"item_id":"helium_ice","quantity":4900},{"item_id":"iron_ore","quantity":141600},{"item_id":"nickel_ore","quantity":86700},{"item_id":"nitrogen_ice","quantity":9800},{"item_id":"silicon_ore","quantity":21200},{"item_id":"silver_ore","quantity":1600},{"item_id":"titanium_ore","quantity":5900},{"item_id":"tungsten_ore","quantity":81350},{"item_id":"water_ice","quantity":4900}]