Steel Frame Assembly Line
A dedicated production line that cuts, bends, and welds steel plates into girder skeletons, then integrates copper piping runs for internal systems. Output is steady and reliable for basic facility construction.
Stats
| Level | 1 |
| Build Cost | 128,000 cr |
| Build Time | 170s |
| Labor | 5 |
| Power Draw | 1 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Assemble Structural Frame |
| Crafting Time | 7.8s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Aluminum Sheet | 3 |
| Copper Piping | 4 |
| Silicate Composite | 2 |
| Steel Plate | 8 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Structural Frame | 2 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 2600 |
| Copper Piping | 950 |
| Control Node | 300 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 600 |
| Copper Ore | 4050 |
| Fluorine Gas | 300 |
| Gold Ore | 600 |
| Iron Ore | 6450 |
| Silicon Ore | 300 |
| Silver Ore | 600 |
| Titanium Ore | 300 |
| Tungsten Ore | 3850 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":600},{"item_id":"copper_ore","quantity":4050},{"item_id":"fluorine_gas","quantity":300},{"item_id":"gold_ore","quantity":600},{"item_id":"iron_ore","quantity":6450},{"item_id":"silicon_ore","quantity":300},{"item_id":"silver_ore","quantity":600},{"item_id":"titanium_ore","quantity":300},{"item_id":"tungsten_ore","quantity":3850}]