Automated Frame Plant

Multi-stage fabrication plant with precision welding stations and integrated plumbing assembly. Coolant loops maintain thermal stability during high-volume production, significantly increasing throughput.
Level2
Build Cost324,000 cr
Build Time250s
Labor10
Power Draw2
Life Support Draw1
Steel FrameAssembly LineAutomated FramePlantHigh-Speed FrameFactoryState-of-the-ArtFrame Facility
OutputAssemble Structural Frame
Crafting Time7.8s
ItemQuantity
Aluminum Sheet3
Copper Piping4
Silicate Composite2
Steel Plate8
ItemQuantity
Structural Frame2
MaterialQuantity
Steel Plate2600
Copper Piping1100
Structural Frame900
Control Node300
Coolant Loop300
View JSON Data
[{"item_id":"aluminum_ore","quantity":5100},{"item_id":"copper_ore","quantity":12600},{"item_id":"fluorine_gas","quantity":300},{"item_id":"gold_ore","quantity":600},{"item_id":"helium_ice","quantity":600},{"item_id":"iron_ore","quantity":16500},{"item_id":"nickel_ore","quantity":1800},{"item_id":"nitrogen_ice","quantity":1200},{"item_id":"silicon_ore","quantity":3900},{"item_id":"silver_ore","quantity":600},{"item_id":"titanium_ore","quantity":300},{"item_id":"tungsten_ore","quantity":10300},{"item_id":"water_ice","quantity":600}]