High-Speed Frame Factory
Industrial-scale operation with synchronized robotic welding arrays and automated pipe-routing systems. Reinforced frame integration and advanced cooling allow near-continuous output of load-bearing structures.
Stats
| Level | 3 |
| Build Cost | 912,000 cr |
| Build Time | 330s |
| Labor | 18 |
| Power Draw | 4 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Assemble Structural Frame |
| Crafting Time | 7.8s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Aluminum Sheet | 3 |
| Copper Piping | 4 |
| Silicate Composite | 2 |
| Steel Plate | 8 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Structural Frame | 2 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 2650 |
| Copper Piping | 1300 |
| Reinforced Frame | 800 |
| Control Node | 400 |
| Coolant Loop | 600 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 28000 |
| Carbon Ore | 14400 |
| Copper Ore | 20500 |
| Fluorine Gas | 400 |
| Gold Ore | 800 |
| Helium Ice | 1200 |
| Iron Ore | 47200 |
| Nickel Ore | 27200 |
| Nitrogen Ice | 2400 |
| Silicon Ore | 6800 |
| Silver Ore | 800 |
| Titanium Ore | 2000 |
| Tungsten Ore | 26950 |
| Water Ice | 1200 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":28000},{"item_id":"carbon_ore","quantity":14400},{"item_id":"copper_ore","quantity":20500},{"item_id":"fluorine_gas","quantity":400},{"item_id":"gold_ore","quantity":800},{"item_id":"helium_ice","quantity":1200},{"item_id":"iron_ore","quantity":47200},{"item_id":"nickel_ore","quantity":27200},{"item_id":"nitrogen_ice","quantity":2400},{"item_id":"silicon_ore","quantity":6800},{"item_id":"silver_ore","quantity":800},{"item_id":"titanium_ore","quantity":2000},{"item_id":"tungsten_ore","quantity":26950},{"item_id":"water_ice","quantity":1200}]