State-of-the-Art Frame Facility

Fully automated modular fabrication system with AI-coordinated welding, precision pipe-fitting, and redundant coolant circulation. Produces complete structural frames at maximum efficiency with minimal downtime.
Level4
Build Cost3,159,000 cr
Build Time420s
Labor25
Power Draw6
Life Support Draw1
Steel FrameAssembly LineAutomated FramePlantHigh-Speed FrameFactoryState-of-the-ArtFrame Facility
OutputAssemble Structural Frame
Crafting Time7.8s
ItemQuantity
Aluminum Sheet3
Copper Piping4
Silicate Composite2
Steel Plate8
ItemQuantity
Structural Frame2
MaterialQuantity
Steel Plate4500
Copper Piping2850
Reinforced Frame2950
Control Node950
Coolant Loop2300
View JSON Data
[{"item_id":"aluminum_ore","quantity":102200},{"item_id":"carbon_ore","quantity":53100},{"item_id":"copper_ore","quantity":68450},{"item_id":"fluorine_gas","quantity":950},{"item_id":"gold_ore","quantity":1900},{"item_id":"helium_ice","quantity":4600},{"item_id":"iron_ore","quantity":161300},{"item_id":"nickel_ore","quantity":100300},{"item_id":"nitrogen_ice","quantity":9200},{"item_id":"silicon_ore","quantity":24550},{"item_id":"silver_ore","quantity":1900},{"item_id":"titanium_ore","quantity":6850},{"item_id":"tungsten_ore","quantity":91900},{"item_id":"water_ice","quantity":4600}]