Pressurized Tank Assembly Plant

An expanded facility with heat-sink integration and plasma-injector staging for thermal management during assembly. Improved workflow efficiency and automated component alignment reduce per-unit time substantially.
Level2
Build Cost447,000 cr
Build Time250s
Labor20
Power Draw2
Life Support Draw1
Fuel TankIntegration LinePressurized TankAssembly PlantFuel TankProduction WorksAutomated FuelSystems Foundry
OutputBuild Expanded Fuel Tank
Crafting Time14.25s
ItemQuantity
Aluminum Sheet4
Flex Polymer3
Fuel Tank3
ItemQuantity
Expanded Fuel Tank1
MaterialQuantity
Steel Plate1200
Copper Piping600
Structural Frame450
Control Node150
Heat Sink450
Plasma Injector150
View JSON Data
[{"item_id":"aluminum_ore","quantity":10200},{"item_id":"copper_ore","quantity":8700},{"item_id":"fluorine_gas","quantity":150},{"item_id":"gold_ore","quantity":300},{"item_id":"iridium_ore","quantity":150},{"item_id":"iron_ore","quantity":9150},{"item_id":"nickel_ore","quantity":900},{"item_id":"palladium_ore","quantity":300},{"item_id":"plasma_residue","quantity":300},{"item_id":"silicon_ore","quantity":2550},{"item_id":"silver_ore","quantity":1500},{"item_id":"titanium_ore","quantity":750},{"item_id":"tungsten_ore","quantity":5850}]