Fuel Tank Production Works

Industrial-scale manufacturing with integrated coolant-loop systems managing heat dissipation during assembly and testing. Quantum-controlled staging and automated pressure validation achieve rapid throughput.
Level3
Build Cost1,302,000 cr
Build Time330s
Labor35
Power Draw4
Life Support Draw1
Fuel TankIntegration LinePressurized TankAssembly PlantFuel TankProduction WorksAutomated FuelSystems Foundry
OutputBuild Expanded Fuel Tank
Crafting Time14.25s
ItemQuantity
Aluminum Sheet4
Flex Polymer3
Fuel Tank3
ItemQuantity
Expanded Fuel Tank1
MaterialQuantity
Steel Plate1300
Copper Piping600
Reinforced Frame400
Control Node200
Heat Sink1000
Plasma Injector350
Coolant Loop600
View JSON Data
[{"item_id":"aluminum_ore","quantity":31400},{"item_id":"carbon_ore","quantity":7200},{"item_id":"copper_ore","quantity":20900},{"item_id":"fluorine_gas","quantity":200},{"item_id":"gold_ore","quantity":400},{"item_id":"helium_ice","quantity":1200},{"item_id":"iridium_ore","quantity":350},{"item_id":"iron_ore","quantity":27800},{"item_id":"nickel_ore","quantity":13600},{"item_id":"nitrogen_ice","quantity":2400},{"item_id":"palladium_ore","quantity":700},{"item_id":"plasma_residue","quantity":700},{"item_id":"silicon_ore","quantity":4800},{"item_id":"silver_ore","quantity":3200},{"item_id":"titanium_ore","quantity":2400},{"item_id":"tungsten_ore","quantity":17000},{"item_id":"water_ice","quantity":1200}]