Fuel Tank Integration Line

A dedicated production facility for assembling pressurized fuel bladder systems. Handles flex-polymer sealing, aluminum sheet fabrication, and structural bolt-down procedures in a steady industrial process.
Level1
Build Cost132,000 cr
Build Time170s
Labor10
Power Draw1
Life Support Draw1
Fuel TankIntegration LinePressurized TankAssembly PlantFuel TankProduction WorksAutomated FuelSystems Foundry
OutputBuild Expanded Fuel Tank
Crafting Time14.25s
ItemQuantity
Aluminum Sheet4
Flex Polymer3
Fuel Tank3
ItemQuantity
Expanded Fuel Tank1
MaterialQuantity
Steel Plate2500
Copper Piping1050
Control Node250
View JSON Data
[{"item_id":"aluminum_ore","quantity":500},{"item_id":"copper_ore","quantity":4150},{"item_id":"fluorine_gas","quantity":250},{"item_id":"gold_ore","quantity":500},{"item_id":"iron_ore","quantity":6300},{"item_id":"silicon_ore","quantity":250},{"item_id":"silver_ore","quantity":500},{"item_id":"titanium_ore","quantity":250},{"item_id":"tungsten_ore","quantity":3800}]