Ion Projection Station

Expanded production facility with structural-frame scaffolding, enhanced processing-core arrays, and parallel sensor-calibration stages for doubled throughput.
Level2
Build Cost594,000 cr
Build Time220s
Labor20
Power Draw2
Life Support Draw1
Ion Gas ProjectorIon ProjectionStationIon EmitterManufacturingPlantIon EmitterSynthesis Facility
OutputBuild Ion Emitter (Gas Method)
Crafting Time27s
ItemQuantity
Ion Solution3
Power Cell1
Superconductor1
ItemQuantity
Ion Emitter1
MaterialQuantity
Steel Plate1050
Copper Piping550
Structural Frame450
Control Node150
Processing Core300
Sensor Array250
View JSON Data
[{"item_id":"aluminum_ore","quantity":5800},{"item_id":"copper_ore","quantity":5450},{"item_id":"energy_crystal","quantity":500},{"item_id":"fluorine_gas","quantity":1900},{"item_id":"gold_ore","quantity":300},{"item_id":"iron_ore","quantity":9050},{"item_id":"krypton_gas","quantity":500},{"item_id":"neon_gas","quantity":500},{"item_id":"nickel_ore","quantity":900},{"item_id":"palladium_ore","quantity":250},{"item_id":"platinum_ore","quantity":600},{"item_id":"silicon_ore","quantity":4600},{"item_id":"silver_ore","quantity":300},{"item_id":"titanium_ore","quantity":1900},{"item_id":"tungsten_ore","quantity":6200}]