Coupling Workshop

A dedicated fabrication line that assembles universal docking collars from durasteel plates and titanium alloy. Control nodes and power distribution circuits ensure reliable ship-to-station interface.
Level1
Build Cost362,000 cr
Build Time240s
Labor17
Power Draw1
Life Support Draw1
Coupling WorkshopDock Assembly YardOrbital DockingWorksMegastructureDocking Complex
OutputBuild Docking Ring
Crafting Time52.5s
ItemQuantity
Circuit Board5
Durasteel Plate10
Power Cell2
Titanium Alloy8
ItemQuantity
Docking Ring1
MaterialQuantity
Steel Plate1700
Copper Piping700
Control Node150
Processing Core200
Sensor Array200
View JSON Data
[{"item_id":"aluminum_ore","quantity":2500},{"item_id":"copper_ore","quantity":3100},{"item_id":"energy_crystal","quantity":400},{"item_id":"fluorine_gas","quantity":1350},{"item_id":"gold_ore","quantity":300},{"item_id":"iron_ore","quantity":5450},{"item_id":"krypton_gas","quantity":400},{"item_id":"neon_gas","quantity":400},{"item_id":"palladium_ore","quantity":200},{"item_id":"platinum_ore","quantity":400},{"item_id":"silicon_ore","quantity":1950},{"item_id":"silver_ore","quantity":300},{"item_id":"titanium_ore","quantity":1350},{"item_id":"tungsten_ore","quantity":3750}]