Automated NiMH Plant

A larger facility with multiple processing cores and sensor arrays that streamline electrode coating and cell sealing, significantly reducing cycle time through parallel assembly stages.
Level2
Build Cost434,000 cr
Build Time250s
Labor16
Power Draw2
Life Support Draw1
NiMH Cell LineAutomated NiMHPlantHigh-Capacity NiMHWorksState-of-the-ArtNiMH Fabrication
OutputAssemble NiMH Power Cell
Crafting Time6.75s
ItemQuantity
Copper Wiring2
Nickel Billet3
ItemQuantity
Power Cell1
MaterialQuantity
Steel Plate700
Copper Piping400
Structural Frame250
Control Node100
Processing Core200
Sensor Array200
View JSON Data
[{"item_id":"aluminum_ore","quantity":3650},{"item_id":"copper_ore","quantity":3500},{"item_id":"energy_crystal","quantity":400},{"item_id":"fluorine_gas","quantity":1300},{"item_id":"gold_ore","quantity":200},{"item_id":"iron_ore","quantity":5600},{"item_id":"krypton_gas","quantity":400},{"item_id":"neon_gas","quantity":400},{"item_id":"nickel_ore","quantity":500},{"item_id":"palladium_ore","quantity":200},{"item_id":"platinum_ore","quantity":400},{"item_id":"silicon_ore","quantity":2900},{"item_id":"silver_ore","quantity":200},{"item_id":"titanium_ore","quantity":1300},{"item_id":"tungsten_ore","quantity":3900}]