Automated Cabin Fabrication

Larger industrial plant with structural framing that accelerates cabin construction and life support integration. Multiple assembly stations work in parallel to frame, outfit, and test each cabin before completion.
Level2
Build Cost3,618,000 cr
Build Time250s
Labor80
Power Draw2
Life Support Draw1
Passenger CabinAssembly PlantAutomated CabinFabricationPrecision CabinManufacturingQuantum CabinManufacturing
OutputBuild Business Passenger Cabin
Crafting Time330s
ItemQuantity
Circuit Board3
Flex Polymer6
Life Support Unit4
Titanium Alloy8
ItemQuantity
Business Passenger Cabin1
MaterialQuantity
Steel Plate9650
Copper Piping5450
Structural Frame3750
Control Node1150
Processing Core2600
Sensor Array2400
View JSON Data
[{"item_id":"aluminum_ore","quantity":49450},{"item_id":"copper_ore","quantity":48250},{"item_id":"energy_crystal","quantity":4800},{"item_id":"fluorine_gas","quantity":16550},{"item_id":"gold_ore","quantity":2300},{"item_id":"iron_ore","quantity":78800},{"item_id":"krypton_gas","quantity":4800},{"item_id":"neon_gas","quantity":4800},{"item_id":"nickel_ore","quantity":7500},{"item_id":"palladium_ore","quantity":2400},{"item_id":"platinum_ore","quantity":5200},{"item_id":"silicon_ore","quantity":39350},{"item_id":"silver_ore","quantity":2300},{"item_id":"titanium_ore","quantity":16550},{"item_id":"tungsten_ore","quantity":54150}]