Wiring Harness Plant

A larger facility with automated winding and multi-stage quality inspection for consistent bundle geometry. Processing cores and sensor arrays verify conductor continuity and insulation integrity.
Level2
Build Cost300,000 cr
Build Time180s
Labor18
Power Draw2
Life Support Draw1
Wiring HarnessWorkshopWiring HarnessPlantWiring HarnessFacilityWiring Harness Hub
OutputBuild Wiring Harness
Crafting Time11.25s
ItemQuantity
Copper Wiring5
Flex Polymer2
ItemQuantity
Wiring Harness3
MaterialQuantity
Steel Plate750
Copper Piping350
Structural Frame300
Control Node100
Processing Core200
Sensor Array200
View JSON Data
[{"item_id":"aluminum_ore","quantity":3900},{"item_id":"copper_ore","quantity":3650},{"item_id":"energy_crystal","quantity":400},{"item_id":"fluorine_gas","quantity":1300},{"item_id":"gold_ore","quantity":200},{"item_id":"iron_ore","quantity":6150},{"item_id":"krypton_gas","quantity":400},{"item_id":"neon_gas","quantity":400},{"item_id":"nickel_ore","quantity":600},{"item_id":"palladium_ore","quantity":200},{"item_id":"platinum_ore","quantity":400},{"item_id":"silicon_ore","quantity":3100},{"item_id":"silver_ore","quantity":200},{"item_id":"titanium_ore","quantity":1300},{"item_id":"tungsten_ore","quantity":4200}]