Silver Battery Workshop

An expanded facility with parallel assembly stations and integrated energy crystal processing. Handles circuit board staging and silver wiring integration at increased production volume.
Level2
Build Cost442,000 cr
Build Time170s
Labor16
Power Draw2
Life Support Draw1
Power CellFabrication LineSilver BatteryWorkshopPower CellManufacturingPlantAdvanced EnergyStorage Facility
OutputBuild Silver Power Cell
Crafting Time6.75s
ItemQuantity
Circuit Board2
Energy Crystal3
Silver Wiring1
ItemQuantity
Power Cell1
MaterialQuantity
Steel Plate700
Copper Piping400
Structural Frame250
Control Node100
Processing Core200
Sensor Array200
View JSON Data
[{"item_id":"aluminum_ore","quantity":3650},{"item_id":"copper_ore","quantity":3500},{"item_id":"energy_crystal","quantity":400},{"item_id":"fluorine_gas","quantity":1300},{"item_id":"gold_ore","quantity":200},{"item_id":"iron_ore","quantity":5600},{"item_id":"krypton_gas","quantity":400},{"item_id":"neon_gas","quantity":400},{"item_id":"nickel_ore","quantity":500},{"item_id":"palladium_ore","quantity":200},{"item_id":"platinum_ore","quantity":400},{"item_id":"silicon_ore","quantity":2900},{"item_id":"silver_ore","quantity":200},{"item_id":"titanium_ore","quantity":1300},{"item_id":"tungsten_ore","quantity":3900}]