Sensor Cluster Assembly Plant

Larger production facility with improved mounting fixtures, better alignment systems, and faster cross-referencing analysis core integration. Structural frames and expanded hull plating storage enable higher throughput and more robust assemblies.
Level2
Build Cost1,136,000 cr
Build Time250s
Labor78
Power Draw2
Life Support Draw1
Sensor ArrayIntegration LineSensor ClusterAssembly PlantSensor ClusterManufacturingComplexIntegrated SensorSystems Factory
OutputBuild Sensor Cluster
Crafting Time58.5s
ItemQuantity
Circuit Board2
Sensor Array2
Sensor Package1
ItemQuantity
Sensor Cluster1
MaterialQuantity
Steel Plate2200
Copper Piping1050
Structural Frame750
Control Node250
Hull Plating850
Reinforced Bulkhead550
View JSON Data
[{"item_id":"aluminum_ore","quantity":60650},{"item_id":"copper_ore","quantity":8650},{"item_id":"fluorine_gas","quantity":250},{"item_id":"gold_ore","quantity":500},{"item_id":"iron_ore","quantity":39300},{"item_id":"nickel_ore","quantity":1500},{"item_id":"silicon_ore","quantity":3250},{"item_id":"silver_ore","quantity":500},{"item_id":"titanium_ore","quantity":10450},{"item_id":"tungsten_ore","quantity":25450}]