Reinforced Frame Fabrication Line
A heavy-duty assembly line that bonds structural frames with durasteel plating, titanium alloy bracing, and graphene sheets into reinforced skeletons. Designed to produce the load-bearing frames required for capital-scale industrial equipment.
Stats
| Level | 1 |
| Build Cost | 136,000 cr |
| Build Time | 170s |
| Labor | 8 |
| Power Draw | 1 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Assemble Reinforced Frame |
| Crafting Time | 19.8s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Durasteel Plate | 6 |
| Graphene Sheet | 3 |
| Structural Frame | 2 |
| Titanium Alloy | 2 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Reinforced Frame | 1 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 2600 |
| Copper Piping | 1250 |
| Control Node | 300 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 600 |
| Copper Ore | 4950 |
| Fluorine Gas | 300 |
| Gold Ore | 600 |
| Iron Ore | 6750 |
| Silicon Ore | 300 |
| Silver Ore | 600 |
| Titanium Ore | 300 |
| Tungsten Ore | 4150 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":600},{"item_id":"copper_ore","quantity":4950},{"item_id":"fluorine_gas","quantity":300},{"item_id":"gold_ore","quantity":600},{"item_id":"iron_ore","quantity":6750},{"item_id":"silicon_ore","quantity":300},{"item_id":"silver_ore","quantity":600},{"item_id":"titanium_ore","quantity":300},{"item_id":"tungsten_ore","quantity":4150}]