Heavy-Duty Frame Manufacturing

Industrial-scale production line with sophisticated coolant loops managing the intense heat generated during durasteel and titanium bonding. Reinforced infrastructure supports continuous output of ultra-durable composite frames.
Level3
Build Cost1,188,000 cr
Build Time330s
Labor28
Power Draw4
Life Support Draw1
Reinforced FrameFabrication LineAdvanced FrameAssembly PlantHeavy-Duty FrameManufacturingReinforced FrameSynthesis Center
OutputAssemble Reinforced Frame
Crafting Time19.8s
ItemQuantity
Durasteel Plate6
Graphene Sheet3
Structural Frame2
Titanium Alloy2
ItemQuantity
Reinforced Frame1
MaterialQuantity
Steel Plate2850
Copper Piping1500
Reinforced Frame950
Control Node500
Coolant Loop700
View JSON Data
[{"item_id":"aluminum_ore","quantity":33300},{"item_id":"carbon_ore","quantity":17100},{"item_id":"copper_ore","quantity":24200},{"item_id":"fluorine_gas","quantity":500},{"item_id":"gold_ore","quantity":1000},{"item_id":"helium_ice","quantity":1400},{"item_id":"iron_ore","quantity":55400},{"item_id":"nickel_ore","quantity":32300},{"item_id":"nitrogen_ice","quantity":2800},{"item_id":"silicon_ore","quantity":8100},{"item_id":"silver_ore","quantity":1000},{"item_id":"titanium_ore","quantity":2400},{"item_id":"tungsten_ore","quantity":31650},{"item_id":"water_ice","quantity":1400}]