Advanced Frame Assembly Plant

A larger facility with expanded bonding chambers and improved coolant management for handling the thermal stress of composite material fusion. Produces reinforced frames at higher throughput for demanding production environments.
Level2
Build Cost391,000 cr
Build Time250s
Labor16
Power Draw2
Life Support Draw1
Reinforced FrameFabrication LineAdvanced FrameAssembly PlantHeavy-Duty FrameManufacturingReinforced FrameSynthesis Center
OutputAssemble Reinforced Frame
Crafting Time19.8s
ItemQuantity
Durasteel Plate6
Graphene Sheet3
Structural Frame2
Titanium Alloy2
ItemQuantity
Reinforced Frame1
MaterialQuantity
Steel Plate2600
Copper Piping1450
Structural Frame1000
Control Node300
Coolant Loop350
View JSON Data
[{"item_id":"aluminum_ore","quantity":5600},{"item_id":"copper_ore","quantity":14700},{"item_id":"fluorine_gas","quantity":300},{"item_id":"gold_ore","quantity":600},{"item_id":"helium_ice","quantity":700},{"item_id":"iron_ore","quantity":18000},{"item_id":"nickel_ore","quantity":2000},{"item_id":"nitrogen_ice","quantity":1400},{"item_id":"silicon_ore","quantity":4300},{"item_id":"silver_ore","quantity":600},{"item_id":"titanium_ore","quantity":300},{"item_id":"tungsten_ore","quantity":11400},{"item_id":"water_ice","quantity":700}]