Precision Propulsion Works

Expanded facility with dedicated titanium-shaping equipment, xenon cryo-storage and dispensing systems, and automated chamber assembly. Sensor arrays verify thrust output before units exit the production line.
Level2
Build Cost344,000 cr
Build Time170s
Labor16
Power Draw2
Life Support Draw1
Micro-ThrusterProduction LinePrecisionPropulsion WorksThrusterManufacturingComplexHypersonicPropulsion Forge
OutputBuild Micro Thruster
Crafting Time6s
ItemQuantity
Flex Polymer1
Purified Xenon2
Titanium Alloy2
ItemQuantity
Micro-Thruster Array2
MaterialQuantity
Steel Plate800
Copper Piping350
Structural Frame300
Control Node100
Processing Core200
Sensor Array200
View JSON Data
[{"item_id":"aluminum_ore","quantity":3900},{"item_id":"copper_ore","quantity":3650},{"item_id":"energy_crystal","quantity":400},{"item_id":"fluorine_gas","quantity":1300},{"item_id":"gold_ore","quantity":200},{"item_id":"iron_ore","quantity":6250},{"item_id":"krypton_gas","quantity":400},{"item_id":"neon_gas","quantity":400},{"item_id":"nickel_ore","quantity":600},{"item_id":"palladium_ore","quantity":200},{"item_id":"platinum_ore","quantity":400},{"item_id":"silicon_ore","quantity":3100},{"item_id":"silver_ore","quantity":200},{"item_id":"titanium_ore","quantity":1300},{"item_id":"tungsten_ore","quantity":4250}]