Ordnance Amplification Factory

Industrial-scale facility with redundant coolant circulation and reinforced containment for plasma-core handling. Heavy copper piping manages energy throughput while cooling systems maintain thermal stability.
Level3
Build Cost1,409,000 cr
Build Time320s
Labor39
Power Draw4
Life Support Draw1
Capacitor ChargingAssemblyWeapon BoostStationOrdnanceAmplificationFactoryFirepowerSynthesis Colossus
OutputBuild Weapon Overload Capacitor
Crafting Time27.3s
ItemQuantity
Power Cell2
Refined Plasma Core1
ItemQuantity
Weapon Overload Capacitor2
MaterialQuantity
Steel Plate2850
Copper Piping1400
Reinforced Frame950
Control Node450
Coolant Loop700
View JSON Data
[{"item_id":"aluminum_ore","quantity":33200},{"item_id":"carbon_ore","quantity":17100},{"item_id":"copper_ore","quantity":23700},{"item_id":"fluorine_gas","quantity":450},{"item_id":"gold_ore","quantity":900},{"item_id":"helium_ice","quantity":1400},{"item_id":"iron_ore","quantity":55250},{"item_id":"nickel_ore","quantity":32300},{"item_id":"nitrogen_ice","quantity":2800},{"item_id":"silicon_ore","quantity":8050},{"item_id":"silver_ore","quantity":900},{"item_id":"titanium_ore","quantity":2350},{"item_id":"tungsten_ore","quantity":31500},{"item_id":"water_ice","quantity":1400}]