Nuclear Mine Plant

Dedicated ordnance facility with weapon housing and barrel assembly integration for mine stabilization. Expanded plutonium handling and warhead staging enable sustained tactical weapons production.
Level2
Build Cost446,000 cr
Build Time210s
Labor24
Power Draw2
Life Support Draw1
Nuclear MineAssembly LineNuclear Mine PlantNuclear Mine WorksNuclear MineComplex
OutputAssemble Nuclear Mines
Crafting Time28.8s
ItemQuantity
Circuit Board1
Durasteel Plate2
Warhead Assembly2
Weapons-Grade Plutonium1
ItemQuantity
Nuclear Mines2
MaterialQuantity
Steel Plate1700
Copper Piping900
Structural Frame650
Control Node200
Weapon Housing700
Barrel Assembly450
View JSON Data
[{"item_id":"aluminum_ore","quantity":23150},{"item_id":"copper_ore","quantity":11600},{"item_id":"fluorine_gas","quantity":200},{"item_id":"gold_ore","quantity":400},{"item_id":"iron_ore","quantity":15150},{"item_id":"nickel_ore","quantity":1300},{"item_id":"silicon_ore","quantity":2800},{"item_id":"silver_ore","quantity":400},{"item_id":"titanium_ore","quantity":2050},{"item_id":"tungsten_ore","quantity":11700}]