Nuclear Mine Assembly Line

Specialized weapons production line for assembling durasteel plates, weapons-grade plutonium, and warhead assemblies into tactical nuclear mines. Robust control systems manage the assembly of high-yield ordnance.
Level1
Build Cost143,000 cr
Build Time150s
Labor12
Power Draw1
Life Support Draw1
Nuclear MineAssembly LineNuclear Mine PlantNuclear Mine WorksNuclear MineComplex
OutputAssemble Nuclear Mines
Crafting Time28.8s
ItemQuantity
Circuit Board1
Durasteel Plate2
Warhead Assembly2
Weapons-Grade Plutonium1
ItemQuantity
Nuclear Mines2
MaterialQuantity
Steel Plate2600
Copper Piping1050
Control Node250
View JSON Data
[{"item_id":"aluminum_ore","quantity":500},{"item_id":"copper_ore","quantity":4150},{"item_id":"fluorine_gas","quantity":250},{"item_id":"gold_ore","quantity":500},{"item_id":"iron_ore","quantity":6500},{"item_id":"silicon_ore","quantity":250},{"item_id":"silver_ore","quantity":500},{"item_id":"titanium_ore","quantity":250},{"item_id":"tungsten_ore","quantity":3900}]