Modular Frame Plant

Industrial-scale facility combining structural frame assembly, reinforced bulkhead integration, and automated docking-ring installation. Increased throughput via parallel processing stations and integrated robotic welding.
Level2
Build Cost2,162,000 cr
Build Time250s
Labor80
Power Draw2
Life Support Draw1
Capital FrameAssembly LineModular FramePlantCapital ShipyardComplexAutomated CapitalFrame Works
OutputBuild Capital Ship Frame
Crafting Time112.5s
ItemQuantity
Durasteel Plate10
Hull Plating5
Reinforced Bulkhead2
Titanium Alloy10
ItemQuantity
Capital Ship Frame1
MaterialQuantity
Steel Plate4600
Copper Piping2050
Structural Frame1700
Control Node500
Hull Plating1600
Reinforced Bulkhead1000
View JSON Data
[{"item_id":"aluminum_ore","quantity":112700},{"item_id":"copper_ore","quantity":18350},{"item_id":"fluorine_gas","quantity":500},{"item_id":"gold_ore","quantity":1000},{"item_id":"iron_ore","quantity":76750},{"item_id":"nickel_ore","quantity":3400},{"item_id":"silicon_ore","quantity":7300},{"item_id":"silver_ore","quantity":1000},{"item_id":"titanium_ore","quantity":19100},{"item_id":"tungsten_ore","quantity":49350}]