Capital Frame Assembly Line

Purpose-built production line for assembling major structural components into capital-class frames. Handles hull plating, bulkheads, and durasteel integration with hydraulic press stations and precision alignment systems.
Level1
Build Cost756,000 cr
Build Time170s
Labor40
Power Draw1
Life Support Draw1
Capital FrameAssembly LineModular FramePlantCapital ShipyardComplexAutomated CapitalFrame Works
OutputBuild Capital Ship Frame
Crafting Time112.5s
ItemQuantity
Durasteel Plate10
Hull Plating5
Reinforced Bulkhead2
Titanium Alloy10
ItemQuantity
Capital Ship Frame1
MaterialQuantity
Steel Plate3300
Copper Piping1250
Control Node300
Hull Plating700
Reinforced Bulkhead350
View JSON Data
[{"item_id":"aluminum_ore","quantity":38400},{"item_id":"copper_ore","quantity":4950},{"item_id":"fluorine_gas","quantity":300},{"item_id":"gold_ore","quantity":600},{"item_id":"iron_ore","quantity":26350},{"item_id":"silicon_ore","quantity":300},{"item_id":"silver_ore","quantity":600},{"item_id":"titanium_ore","quantity":6950},{"item_id":"tungsten_ore","quantity":16750}]