Mk.II Reactor Assembly Cell

A large-scale assembly facility that integrates completed Reactor I units with additional fuel assemblies, expanded lead shielding, and enhanced radiation-hardened control systems. Heavy shielding and staged assembly procedures manage the complexity of a high-output reactor core.
Level1
Build Cost2,025,000 cr
Build Time360s
Labor35
Power Draw1
Life Support Draw1
Mk.II ReactorAssembly CellHeavy ReactorFabrication BayIndustrial ReactorModule PlantAdvanced HeavyReactor Complex
OutputBuild Nuclear Reactor II
Crafting Time735s
ItemQuantity
Lead Sheet20
Nuclear Reactor I1
Radiation-Hardened Circuit8
Reactor Fuel Assembly3
Superconductor4
Titanium Alloy8
ItemQuantity
Nuclear Reactor II1
MaterialQuantity
Steel Plate15750
Copper Piping6200
Control Node1550
Lead Shielding6400
Radiation-Hardened Circuit1500
View JSON Data
[{"item_id":"aluminum_ore","quantity":6100},{"item_id":"copper_ore","quantity":24800},{"item_id":"fluorine_gas","quantity":3050},{"item_id":"gold_ore","quantity":3100},{"item_id":"iron_ore","quantity":53550},{"item_id":"lead_ore","quantity":51200},{"item_id":"radium_ore","quantity":3000},{"item_id":"silicon_ore","quantity":3050},{"item_id":"silver_ore","quantity":3100},{"item_id":"titanium_ore","quantity":3050},{"item_id":"tungsten_ore","quantity":31400}]