Industrial Reactor Module Plant

Heavy production facility with reinforced assembly frames, integrated hazmat-container systems, and automated fuel-stack validation. Lead shielding covers multiple layers while quantum control cores monitor neutron flux and thermal characteristics throughout multi-hour assembly cycles.
Level3
Build Cost13,877,000 cr
Build Time700s
Labor105
Power Draw4
Life Support Draw1
Mk.II ReactorAssembly CellHeavy ReactorFabrication BayIndustrial ReactorModule PlantAdvanced HeavyReactor Complex
OutputBuild Nuclear Reactor II
Crafting Time735s
ItemQuantity
Lead Sheet20
Nuclear Reactor I1
Radiation-Hardened Circuit8
Reactor Fuel Assembly3
Superconductor4
Titanium Alloy8
ItemQuantity
Nuclear Reactor II1
MaterialQuantity
Steel Plate19650
Copper Piping10250
Reinforced Frame6900
Control Node3600
Lead Shielding25450
Radiation-Hardened Circuit9750
Hazmat Container5450
Base MaterialQuantity
Aluminum Ore392100
Carbon Ore124200
Copper Ore127950
Fluorine Gas13350
Gold Ore7200
Iron Ore532200
Lead Ore269000
Nickel Ore234600
Radium Ore19500
Silicon Ore68550
Silver Ore7200
Titanium Ore38050
Tungsten Ore291700
View JSON Data
[{"item_id":"aluminum_ore","quantity":392100},{"item_id":"carbon_ore","quantity":124200},{"item_id":"copper_ore","quantity":127950},{"item_id":"fluorine_gas","quantity":13350},{"item_id":"gold_ore","quantity":7200},{"item_id":"iron_ore","quantity":532200},{"item_id":"lead_ore","quantity":269000},{"item_id":"nickel_ore","quantity":234600},{"item_id":"radium_ore","quantity":19500},{"item_id":"silicon_ore","quantity":68550},{"item_id":"silver_ore","quantity":7200},{"item_id":"titanium_ore","quantity":38050},{"item_id":"tungsten_ore","quantity":291700}]