Mining Survey Lab
Expanded facility with parallel assembly tracks and integrated quality control loops. Increased coolant circulation supports higher throughput without sacrificing component tolerances.
Stats
| Level | 2 |
| Build Cost | 377,000 cr |
| Build Time | 170s |
| Labor | 16 |
| Power Draw | 2 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Build Mining Survey Probe |
| Crafting Time | 10.8s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Circuit Board | 2 |
| Micro-Thruster Array | 1 |
| Titanium Alloy | 1 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Mining Survey Probe | 4 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 2200 |
| Copper Piping | 1300 |
| Structural Frame | 900 |
| Control Node | 350 |
| Coolant Loop | 300 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 5200 |
| Copper Ore | 13400 |
| Fluorine Gas | 350 |
| Gold Ore | 700 |
| Helium Ice | 600 |
| Iron Ore | 15950 |
| Nickel Ore | 1800 |
| Nitrogen Ice | 1200 |
| Silicon Ore | 3950 |
| Silver Ore | 700 |
| Titanium Ore | 350 |
| Tungsten Ore | 10150 |
| Water Ice | 600 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":5200},{"item_id":"copper_ore","quantity":13400},{"item_id":"fluorine_gas","quantity":350},{"item_id":"gold_ore","quantity":700},{"item_id":"helium_ice","quantity":600},{"item_id":"iron_ore","quantity":15950},{"item_id":"nickel_ore","quantity":1800},{"item_id":"nitrogen_ice","quantity":1200},{"item_id":"silicon_ore","quantity":3950},{"item_id":"silver_ore","quantity":700},{"item_id":"titanium_ore","quantity":350},{"item_id":"tungsten_ore","quantity":10150},{"item_id":"water_ice","quantity":600}]