Mining Survey Lab

Expanded facility with parallel assembly tracks and integrated quality control loops. Increased coolant circulation supports higher throughput without sacrificing component tolerances.
Level2
Build Cost377,000 cr
Build Time170s
Labor16
Power Draw2
Life Support Draw1
Probe AssemblyLineMining Survey LabMineral AnalysisPlantMiningIntelligence Nexus
OutputBuild Mining Survey Probe
Crafting Time10.8s
ItemQuantity
Circuit Board2
Micro-Thruster Array1
Titanium Alloy1
ItemQuantity
Mining Survey Probe4
MaterialQuantity
Steel Plate2200
Copper Piping1300
Structural Frame900
Control Node350
Coolant Loop300
View JSON Data
[{"item_id":"aluminum_ore","quantity":5200},{"item_id":"copper_ore","quantity":13400},{"item_id":"fluorine_gas","quantity":350},{"item_id":"gold_ore","quantity":700},{"item_id":"helium_ice","quantity":600},{"item_id":"iron_ore","quantity":15950},{"item_id":"nickel_ore","quantity":1800},{"item_id":"nitrogen_ice","quantity":1200},{"item_id":"silicon_ore","quantity":3950},{"item_id":"silver_ore","quantity":700},{"item_id":"titanium_ore","quantity":350},{"item_id":"tungsten_ore","quantity":10150},{"item_id":"water_ice","quantity":600}]