Mining Intelligence Nexus

State-of-the-art facility with redundant production channels and advanced thermal management. Extensive reinforced framing and coolant loops allow near-continuous probe delivery at peak efficiency.
Level4
Build Cost3,419,000 cr
Build Time290s
Labor40
Power Draw6
Life Support Draw1
Probe AssemblyLineMining Survey LabMineral AnalysisPlantMiningIntelligence Nexus
OutputBuild Mining Survey Probe
Crafting Time10.8s
ItemQuantity
Circuit Board2
Micro-Thruster Array1
Titanium Alloy1
ItemQuantity
Mining Survey Probe4
MaterialQuantity
Steel Plate4150
Copper Piping2800
Reinforced Frame2850
Control Node900
Coolant Loop2200
View JSON Data
[{"item_id":"aluminum_ore","quantity":98700},{"item_id":"carbon_ore","quantity":51300},{"item_id":"copper_ore","quantity":66000},{"item_id":"fluorine_gas","quantity":900},{"item_id":"gold_ore","quantity":1800},{"item_id":"helium_ice","quantity":4400},{"item_id":"iron_ore","quantity":155400},{"item_id":"nickel_ore","quantity":96900},{"item_id":"nitrogen_ice","quantity":8800},{"item_id":"silicon_ore","quantity":23700},{"item_id":"silver_ore","quantity":1800},{"item_id":"titanium_ore","quantity":6600},{"item_id":"tungsten_ore","quantity":88550},{"item_id":"water_ice","quantity":4400}]