Mineral Analysis Plant

Industrial-scale manufacturing with reinforced structural framing and distributed control nodes managing simultaneous probe builds. Heavy coolant infrastructure enables sustained rapid output.
Level3
Build Cost1,109,000 cr
Build Time230s
Labor28
Power Draw4
Life Support Draw1
Probe AssemblyLineMining Survey LabMineral AnalysisPlantMiningIntelligence Nexus
OutputBuild Mining Survey Probe
Crafting Time10.8s
ItemQuantity
Circuit Board2
Micro-Thruster Array1
Titanium Alloy1
ItemQuantity
Mining Survey Probe4
MaterialQuantity
Steel Plate2750
Copper Piping1400
Reinforced Frame850
Control Node450
Coolant Loop700
View JSON Data
[{"item_id":"aluminum_ore","quantity":29800},{"item_id":"carbon_ore","quantity":15300},{"item_id":"copper_ore","quantity":22500},{"item_id":"fluorine_gas","quantity":450},{"item_id":"gold_ore","quantity":900},{"item_id":"helium_ice","quantity":1400},{"item_id":"iron_ore","quantity":50250},{"item_id":"nickel_ore","quantity":28900},{"item_id":"nitrogen_ice","quantity":2800},{"item_id":"silicon_ore","quantity":7250},{"item_id":"silver_ore","quantity":900},{"item_id":"titanium_ore","quantity":2150},{"item_id":"tungsten_ore","quantity":28800},{"item_id":"water_ice","quantity":1400}]