Mineral Analysis Plant
Industrial-scale manufacturing with reinforced structural framing and distributed control nodes managing simultaneous probe builds. Heavy coolant infrastructure enables sustained rapid output.
Stats
| Level | 3 |
| Build Cost | 1,109,000 cr |
| Build Time | 230s |
| Labor | 28 |
| Power Draw | 4 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Build Mining Survey Probe |
| Crafting Time | 10.8s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Circuit Board | 2 |
| Micro-Thruster Array | 1 |
| Titanium Alloy | 1 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Mining Survey Probe | 4 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 2750 |
| Copper Piping | 1400 |
| Reinforced Frame | 850 |
| Control Node | 450 |
| Coolant Loop | 700 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 29800 |
| Carbon Ore | 15300 |
| Copper Ore | 22500 |
| Fluorine Gas | 450 |
| Gold Ore | 900 |
| Helium Ice | 1400 |
| Iron Ore | 50250 |
| Nickel Ore | 28900 |
| Nitrogen Ice | 2800 |
| Silicon Ore | 7250 |
| Silver Ore | 900 |
| Titanium Ore | 2150 |
| Tungsten Ore | 28800 |
| Water Ice | 1400 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":29800},{"item_id":"carbon_ore","quantity":15300},{"item_id":"copper_ore","quantity":22500},{"item_id":"fluorine_gas","quantity":450},{"item_id":"gold_ore","quantity":900},{"item_id":"helium_ice","quantity":1400},{"item_id":"iron_ore","quantity":50250},{"item_id":"nickel_ore","quantity":28900},{"item_id":"nitrogen_ice","quantity":2800},{"item_id":"silicon_ore","quantity":7250},{"item_id":"silver_ore","quantity":900},{"item_id":"titanium_ore","quantity":2150},{"item_id":"tungsten_ore","quantity":28800},{"item_id":"water_ice","quantity":1400}]