Lead-Lined Cargo Plant

Heavy-duty production with reinforced frames handling continuous lead-sheet deposition and integrated coolant systems for thermal stability. Control nodes coordinate multi-stage sealing and pressure testing.
Level3
Build Cost1,126,000 cr
Build Time240s
Labor28
Power Draw4
Life Support Draw1
Lead LiningWorkshopCargo ShieldingBayLead-Lined CargoPlantAdvanced CargoShielding Complex
OutputBuild Lead Lined Cargo I
Crafting Time12.75s
ItemQuantity
Circuit Board2
Flex Polymer4
Lead Sheet8
Steel Plate6
ItemQuantity
Lead Lined Cargo I1
MaterialQuantity
Steel Plate2700
Copper Piping1200
Reinforced Frame800
Control Node450
Coolant Loop700
View JSON Data
[{"item_id":"aluminum_ore","quantity":28100},{"item_id":"carbon_ore","quantity":14400},{"item_id":"copper_ore","quantity":21300},{"item_id":"fluorine_gas","quantity":450},{"item_id":"gold_ore","quantity":900},{"item_id":"helium_ice","quantity":1400},{"item_id":"iron_ore","quantity":47550},{"item_id":"nickel_ore","quantity":27200},{"item_id":"nitrogen_ice","quantity":2800},{"item_id":"silicon_ore","quantity":6850},{"item_id":"silver_ore","quantity":900},{"item_id":"titanium_ore","quantity":2050},{"item_id":"tungsten_ore","quantity":27250},{"item_id":"water_ice","quantity":1400}]