Cargo Shielding Bay
Larger facility with coolant-loop circulation through the lead-lamination process, preventing thermal warping during assembly. Structural frames support heavier pressing machinery.
Stats
| Level | 2 |
| Build Cost | 405,000 cr |
| Build Time | 175s |
| Labor | 16 |
| Power Draw | 2 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Build Lead Lined Cargo I |
| Crafting Time | 12.75s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Circuit Board | 2 |
| Flex Polymer | 4 |
| Lead Sheet | 8 |
| Steel Plate | 6 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Lead Lined Cargo I | 1 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 2500 |
| Copper Piping | 1150 |
| Structural Frame | 1000 |
| Control Node | 300 |
| Coolant Loop | 300 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 5600 |
| Copper Ore | 13350 |
| Fluorine Gas | 300 |
| Gold Ore | 600 |
| Helium Ice | 600 |
| Iron Ore | 17350 |
| Nickel Ore | 2000 |
| Nitrogen Ice | 1200 |
| Silicon Ore | 4300 |
| Silver Ore | 600 |
| Titanium Ore | 300 |
| Tungsten Ore | 10850 |
| Water Ice | 600 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":5600},{"item_id":"copper_ore","quantity":13350},{"item_id":"fluorine_gas","quantity":300},{"item_id":"gold_ore","quantity":600},{"item_id":"helium_ice","quantity":600},{"item_id":"iron_ore","quantity":17350},{"item_id":"nickel_ore","quantity":2000},{"item_id":"nitrogen_ice","quantity":1200},{"item_id":"silicon_ore","quantity":4300},{"item_id":"silver_ore","quantity":600},{"item_id":"titanium_ore","quantity":300},{"item_id":"tungsten_ore","quantity":10850},{"item_id":"water_ice","quantity":600}]