Hull Assembly Line
Industrial-scale plant featuring reinforced framing, docking rings for material handling, and precision control nodes that enable rapid production of hull sections at full military specifications. Integrated bulkhead structures support the mechanical stresses of continuous high-volume operation.
Stats
| Level | 3 |
| Build Cost | 787,000 cr |
| Build Time | 200s |
| Labor | 25 |
| Power Draw | 4 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Forge Hull Plating |
| Crafting Time | 6.15s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Steel Plate | 4 |
| Titanium Alloy | 1 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Hull Plating | 1 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 650 |
| Copper Piping | 300 |
| Reinforced Frame | 200 |
| Control Node | 100 |
| Hull Plating | 450 |
| Reinforced Bulkhead | 300 |
| Docking Ring | 150 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 53500 |
| Carbon Ore | 3600 |
| Copper Ore | 4000 |
| Fluorine Gas | 1150 |
| Gold Ore | 200 |
| Iron Ore | 34550 |
| Lead Ore | 300 |
| Nickel Ore | 14300 |
| Nitrogen Ice | 300 |
| Silicon Ore | 2450 |
| Silver Ore | 200 |
| Titanium Ore | 8000 |
| Tungsten Ore | 20650 |
| Uranium Ore | 1200 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":53500},{"item_id":"carbon_ore","quantity":3600},{"item_id":"copper_ore","quantity":4000},{"item_id":"fluorine_gas","quantity":1150},{"item_id":"gold_ore","quantity":200},{"item_id":"iron_ore","quantity":34550},{"item_id":"lead_ore","quantity":300},{"item_id":"nickel_ore","quantity":14300},{"item_id":"nitrogen_ice","quantity":300},{"item_id":"silicon_ore","quantity":2450},{"item_id":"silver_ore","quantity":200},{"item_id":"titanium_ore","quantity":8000},{"item_id":"tungsten_ore","quantity":20650},{"item_id":"uranium_ore","quantity":1200}]