Armor Fabricator

Expanded facility with structural frames and reinforced bulkheads that support higher-speed material throughput while maintaining consistent bond strength and dimensional tolerances. Automated staging feeds pre-cut steel and titanium into the bonding chambers in sequence.
Level2
Build Cost295,000 cr
Build Time150s
Labor14
Power Draw2
Life Support Draw1
Plate PressArmor FabricatorHull Assembly LineStellar PlatingWorks
OutputForge Hull Plating
Crafting Time6.15s
ItemQuantity
Steel Plate4
Titanium Alloy1
ItemQuantity
Hull Plating1
MaterialQuantity
Steel Plate700
Copper Piping350
Structural Frame250
Control Node100
Hull Plating250
Reinforced Bulkhead200
View JSON Data
[{"item_id":"aluminum_ore","quantity":21250},{"item_id":"copper_ore","quantity":2950},{"item_id":"fluorine_gas","quantity":100},{"item_id":"gold_ore","quantity":200},{"item_id":"iron_ore","quantity":13250},{"item_id":"nickel_ore","quantity":500},{"item_id":"silicon_ore","quantity":1100},{"item_id":"silver_ore","quantity":200},{"item_id":"titanium_ore","quantity":3750},{"item_id":"tungsten_ore","quantity":8700}]