Heavy Rad Workshop

A specialized production line for integrating superconducting beam emitters and titanium alloy shielding into advanced harvester platforms. Handles the precision assembly of hot-isotope extraction equipment.
Level1
Build Cost398,000 cr
Build Time140s
Labor14
Power Draw1
Life Support Draw1
Heavy Rad WorkshopIndustrial RadFabricatorHeavy ShieldingPlantCapital RadManufacturing Hub
OutputBuild Rad Harvester III
Crafting Time61.5s
ItemQuantity
Lead Sheet6
Power Cell2
Rad Harvester II1
Superconductor1
Titanium Alloy2
ItemQuantity
Rad Harvester III1
MaterialQuantity
Steel Plate5850
Copper Piping2450
Control Node550
Coolant Loop600
View JSON Data
[{"item_id":"aluminum_ore","quantity":1100},{"item_id":"copper_ore","quantity":14950},{"item_id":"fluorine_gas","quantity":550},{"item_id":"gold_ore","quantity":1100},{"item_id":"helium_ice","quantity":1200},{"item_id":"iron_ore","quantity":16500},{"item_id":"nitrogen_ice","quantity":2400},{"item_id":"silicon_ore","quantity":550},{"item_id":"silver_ore","quantity":1100},{"item_id":"titanium_ore","quantity":550},{"item_id":"tungsten_ore","quantity":10650},{"item_id":"water_ice","quantity":1200}]