Capital Rad Manufacturing Hub

State-of-the-art facility with maximal coolant circulation, reinforced infrastructure, and automated superconductor integration for continuous production of industrial-grade rad harvesters. Delivers optimized titanium shielding and beam-emitter performance.
Level4
Build Cost11,505,000 cr
Build Time320s
Labor50
Power Draw6
Life Support Draw1
Heavy Rad WorkshopIndustrial RadFabricatorHeavy ShieldingPlantCapital RadManufacturing Hub
OutputBuild Rad Harvester III
Crafting Time61.5s
ItemQuantity
Lead Sheet6
Power Cell2
Rad Harvester II1
Superconductor1
Titanium Alloy2
ItemQuantity
Rad Harvester III1
MaterialQuantity
Steel Plate14950
Copper Piping10100
Reinforced Frame9850
Control Node3350
Coolant Loop7100
View JSON Data
[{"item_id":"aluminum_ore","quantity":341600},{"item_id":"carbon_ore","quantity":177300},{"item_id":"copper_ore","quantity":225800},{"item_id":"fluorine_gas","quantity":3350},{"item_id":"gold_ore","quantity":6700},{"item_id":"helium_ice","quantity":14200},{"item_id":"iron_ore","quantity":537450},{"item_id":"nickel_ore","quantity":334900},{"item_id":"nitrogen_ice","quantity":28400},{"item_id":"silicon_ore","quantity":82150},{"item_id":"silver_ore","quantity":6700},{"item_id":"titanium_ore","quantity":23050},{"item_id":"tungsten_ore","quantity":305800},{"item_id":"water_ice","quantity":14200}]