Geological Analysis Plant
Larger facility with structural reinforcement and expanded processing capacity for handling the more demanding assembly of advanced scanner units. Multiple assembly stations reduce bottlenecks in crystal and sensor integration.
Stats
| Level | 2 |
| Build Cost | 4,195,000 cr |
| Build Time | 250s |
| Labor | 20 |
| Power Draw | 2 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Build Survey Scanner II |
| Crafting Time | 210s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Circuit Board | 3 |
| Focused Crystal | 3 |
| Sensor Array | 2 |
| Stabilized Exotic | 1 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Survey Scanner II | 1 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 9050 |
| Copper Piping | 4100 |
| Structural Frame | 3600 |
| Control Node | 1050 |
| Processing Core | 2100 |
| Sensor Array | 2250 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 43350 |
| Copper Ore | 42600 |
| Energy Crystal | 4500 |
| Fluorine Gas | 13800 |
| Gold Ore | 2100 |
| Iron Ore | 72000 |
| Krypton Gas | 4500 |
| Neon Gas | 4500 |
| Nickel Ore | 7200 |
| Palladium Ore | 2250 |
| Platinum Ore | 4200 |
| Silicon Ore | 34500 |
| Silver Ore | 2100 |
| Titanium Ore | 13800 |
| Tungsten Ore | 48550 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":43350},{"item_id":"copper_ore","quantity":42600},{"item_id":"energy_crystal","quantity":4500},{"item_id":"fluorine_gas","quantity":13800},{"item_id":"gold_ore","quantity":2100},{"item_id":"iron_ore","quantity":72000},{"item_id":"krypton_gas","quantity":4500},{"item_id":"neon_gas","quantity":4500},{"item_id":"nickel_ore","quantity":7200},{"item_id":"palladium_ore","quantity":2250},{"item_id":"platinum_ore","quantity":4200},{"item_id":"silicon_ore","quantity":34500},{"item_id":"silver_ore","quantity":2100},{"item_id":"titanium_ore","quantity":13800},{"item_id":"tungsten_ore","quantity":48550}]