Geological Analysis Plant

Larger facility with structural reinforcement and expanded processing capacity for handling the more demanding assembly of advanced scanner units. Multiple assembly stations reduce bottlenecks in crystal and sensor integration.
Level2
Build Cost4,195,000 cr
Build Time250s
Labor20
Power Draw2
Life Support Draw1
Advanced SensorAssembly LineGeologicalAnalysis PlantAdvanced SurveyScanner FactoryPrecisionGeologicalInstrument Works
OutputBuild Survey Scanner II
Crafting Time210s
ItemQuantity
Circuit Board3
Focused Crystal3
Sensor Array2
Stabilized Exotic1
ItemQuantity
Survey Scanner II1
MaterialQuantity
Steel Plate9050
Copper Piping4100
Structural Frame3600
Control Node1050
Processing Core2100
Sensor Array2250
View JSON Data
[{"item_id":"aluminum_ore","quantity":43350},{"item_id":"copper_ore","quantity":42600},{"item_id":"energy_crystal","quantity":4500},{"item_id":"fluorine_gas","quantity":13800},{"item_id":"gold_ore","quantity":2100},{"item_id":"iron_ore","quantity":72000},{"item_id":"krypton_gas","quantity":4500},{"item_id":"neon_gas","quantity":4500},{"item_id":"nickel_ore","quantity":7200},{"item_id":"palladium_ore","quantity":2250},{"item_id":"platinum_ore","quantity":4200},{"item_id":"silicon_ore","quantity":34500},{"item_id":"silver_ore","quantity":2100},{"item_id":"titanium_ore","quantity":13800},{"item_id":"tungsten_ore","quantity":48550}]