Gas Compression Plant

Industrial facility with quantum control managing superconductor alignment and precision optics calibration. Reinforced construction enables sustained production of improved harvester units.
Level3
Build Cost1,611,000 cr
Build Time280s
Labor32
Power Draw4
Life Support Draw1
CompressionCollectorEnhanced HarvesterFacilityGas CompressionPlantAdvancedCompression Array
OutputBuild Gas Harvester II
Crafting Time37.5s
ItemQuantity
Ceramite Plating2
Gas Harvester I1
Power Cell1
Superconductor1
ItemQuantity
Gas Harvester II1
MaterialQuantity
Steel Plate1500
Copper Piping750
Reinforced Frame500
Quantum Control Core200
Processing Core650
Sensor Array700
Precision Optic350
View JSON Data
[{"item_id":"aluminum_ore","quantity":27000},{"item_id":"carbon_ore","quantity":51000},{"item_id":"copper_ore","quantity":11250},{"item_id":"energy_crystal","quantity":1400},{"item_id":"fluorine_gas","quantity":5350},{"item_id":"gold_ore","quantity":1600},{"item_id":"iron_ore","quantity":34500},{"item_id":"krypton_gas","quantity":1400},{"item_id":"neon_gas","quantity":1400},{"item_id":"nickel_ore","quantity":17000},{"item_id":"palladium_ore","quantity":700},{"item_id":"platinum_ore","quantity":1700},{"item_id":"quantum_fragments","quantity":400},{"item_id":"silicon_ore","quantity":11900},{"item_id":"silver_ore","quantity":800},{"item_id":"sol_alloy_ore","quantity":1050},{"item_id":"titanium_ore","quantity":6350},{"item_id":"tungsten_ore","quantity":21300}]