ECU Assembly Plant

An expanded facility with dedicated sensor-array calibration and processing-core integration stations. Modular assembly design and parallel workflows significantly boost output rates.
Level2
Build Cost278,000 cr
Build Time180s
Labor18
Power Draw2
Life Support Draw1
EnvironmentalSystems AssemblyECU Assembly PlantECU ManufacturingFacilityECU ManufacturingHub
OutputBuild Environmental Control Unit
Crafting Time4.2s
ItemQuantity
Flex Polymer4
Steel Plate3
Synthetic Compound2
ItemQuantity
Environmental Control Unit1
MaterialQuantity
Steel Plate700
Copper Piping350
Structural Frame300
Control Node100
Processing Core150
Sensor Array200
View JSON Data
[{"item_id":"aluminum_ore","quantity":3400},{"item_id":"copper_ore","quantity":3650},{"item_id":"energy_crystal","quantity":400},{"item_id":"fluorine_gas","quantity":1050},{"item_id":"gold_ore","quantity":200},{"item_id":"iron_ore","quantity":5800},{"item_id":"krypton_gas","quantity":400},{"item_id":"neon_gas","quantity":400},{"item_id":"nickel_ore","quantity":600},{"item_id":"palladium_ore","quantity":200},{"item_id":"platinum_ore","quantity":300},{"item_id":"silicon_ore","quantity":2700},{"item_id":"silver_ore","quantity":200},{"item_id":"titanium_ore","quantity":1050},{"item_id":"tungsten_ore","quantity":3900}]