Deep Core Survey Scanner Production Lab
Multi-station assembly plant with dedicated sensor integration bays and automated crystal alignment systems. Increased throughput comes from parallel component staging and faster optical calibration routines.
Stats
| Level | 2 |
| Build Cost | 4,467,000 cr |
| Build Time | 140s |
| Labor | 12 |
| Power Draw | 2 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Craft Deep Core Survey Scanner |
| Crafting Time | 225s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Deep Core Survey Lens | 1 |
| Focused Crystal | 3 |
| Sensor Array | 2 |
| Stabilized Exotic | 1 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Deep Core Survey Scanner | 1 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 9600 |
| Copper Piping | 5050 |
| Structural Frame | 3200 |
| Control Node | 1250 |
| Processing Core | 2300 |
| Sensor Array | 2400 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 43900 |
| Copper Ore | 44150 |
| Energy Crystal | 4800 |
| Fluorine Gas | 15150 |
| Gold Ore | 2500 |
| Iron Ore | 71400 |
| Krypton Gas | 4800 |
| Neon Gas | 4800 |
| Nickel Ore | 6400 |
| Palladium Ore | 2400 |
| Platinum Ore | 4600 |
| Silicon Ore | 34850 |
| Silver Ore | 2500 |
| Titanium Ore | 15150 |
| Tungsten Ore | 49000 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":43900},{"item_id":"copper_ore","quantity":44150},{"item_id":"energy_crystal","quantity":4800},{"item_id":"fluorine_gas","quantity":15150},{"item_id":"gold_ore","quantity":2500},{"item_id":"iron_ore","quantity":71400},{"item_id":"krypton_gas","quantity":4800},{"item_id":"neon_gas","quantity":4800},{"item_id":"nickel_ore","quantity":6400},{"item_id":"palladium_ore","quantity":2400},{"item_id":"platinum_ore","quantity":4600},{"item_id":"silicon_ore","quantity":34850},{"item_id":"silver_ore","quantity":2500},{"item_id":"titanium_ore","quantity":15150},{"item_id":"tungsten_ore","quantity":49000}]