Cryo-Transport Manufacturing

An integrated facility combining storage unit assembly, coolant loop pressurization, and circuit board installation on a single conveyor system. Sensor arrays verify proper suspension fluid distribution at each stage.
Level2
Build Cost356,000 cr
Build Time250s
Labor16
Power Draw2
Life Support Draw1
Suspension PodAssemblyCryo-TransportManufacturingAutomatedSuspension PodFactoryNext-GenerationCryo-Pod Line
OutputAssemble Cryogenic Travel Pod
Crafting Time12s
ItemQuantity
Circuit Board1
Coolant Fluid4
Copper Piping2
Cryogenic Storage1
ItemQuantity
Cryogenic Travel Pod1
MaterialQuantity
Steel Plate800
Copper Piping350
Structural Frame300
Control Node100
Processing Core150
Sensor Array200
View JSON Data
[{"item_id":"aluminum_ore","quantity":3400},{"item_id":"copper_ore","quantity":3650},{"item_id":"energy_crystal","quantity":400},{"item_id":"fluorine_gas","quantity":1050},{"item_id":"gold_ore","quantity":200},{"item_id":"iron_ore","quantity":6000},{"item_id":"krypton_gas","quantity":400},{"item_id":"neon_gas","quantity":400},{"item_id":"nickel_ore","quantity":600},{"item_id":"palladium_ore","quantity":200},{"item_id":"platinum_ore","quantity":300},{"item_id":"silicon_ore","quantity":2700},{"item_id":"silver_ore","quantity":200},{"item_id":"titanium_ore","quantity":1050},{"item_id":"tungsten_ore","quantity":4000}]