Bulkhead Manufacturing Works
Industrial-grade facility featuring reinforced structural framing, docking rings for automated material staging, and precision pressure systems that bond hull sections and armor plates into integrated bulkheads at scale. Advanced control systems maintain tolerance across multiple simultaneous production lines.
Stats
| Level | 3 |
| Build Cost | 1,626,000 cr |
| Build Time | 330s |
| Labor | 63 |
| Power Draw | 4 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Forge Reinforced Bulkhead |
| Crafting Time | 27s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Armor Plate | 1 |
| Hull Plating | 2 |
| Titanium Alloy | 5 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Reinforced Bulkhead | 1 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 950 |
| Copper Piping | 450 |
| Reinforced Frame | 350 |
| Control Node | 150 |
| Hull Plating | 700 |
| Reinforced Bulkhead | 500 |
| Docking Ring | 200 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 83800 |
| Carbon Ore | 6300 |
| Copper Ore | 6550 |
| Fluorine Gas | 1550 |
| Gold Ore | 300 |
| Iron Ore | 54500 |
| Lead Ore | 400 |
| Nickel Ore | 21900 |
| Nitrogen Ice | 400 |
| Silicon Ore | 3950 |
| Silver Ore | 300 |
| Titanium Ore | 12650 |
| Tungsten Ore | 32750 |
| Uranium Ore | 1600 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":83800},{"item_id":"carbon_ore","quantity":6300},{"item_id":"copper_ore","quantity":6550},{"item_id":"fluorine_gas","quantity":1550},{"item_id":"gold_ore","quantity":300},{"item_id":"iron_ore","quantity":54500},{"item_id":"lead_ore","quantity":400},{"item_id":"nickel_ore","quantity":21900},{"item_id":"nitrogen_ice","quantity":400},{"item_id":"silicon_ore","quantity":3950},{"item_id":"silver_ore","quantity":300},{"item_id":"titanium_ore","quantity":12650},{"item_id":"tungsten_ore","quantity":32750},{"item_id":"uranium_ore","quantity":1600}]