Reinforced Bulkhead Plant

Expanded production facility with structural frames and hull plating inventory systems that enable faster lamination cycles and improved dimensional consistency. Control nodes coordinate the multi-stage bonding process to ensure uniform stress distribution in finished frames.
Level2
Build Cost527,000 cr
Build Time250s
Labor36
Power Draw2
Life Support Draw1
Bulkhead FramingStationReinforcedBulkhead PlantBulkheadManufacturingWorksReinforcedBulkheadFabricationComplex
OutputForge Reinforced Bulkhead
Crafting Time27s
ItemQuantity
Armor Plate1
Hull Plating2
Titanium Alloy5
ItemQuantity
Reinforced Bulkhead1
MaterialQuantity
Steel Plate1050
Copper Piping450
Structural Frame400
Control Node150
Hull Plating350
Reinforced Bulkhead250
View JSON Data
[{"item_id":"aluminum_ore","quantity":27500},{"item_id":"copper_ore","quantity":4350},{"item_id":"fluorine_gas","quantity":150},{"item_id":"gold_ore","quantity":300},{"item_id":"iron_ore","quantity":18200},{"item_id":"nickel_ore","quantity":800},{"item_id":"silicon_ore","quantity":1750},{"item_id":"silver_ore","quantity":300},{"item_id":"titanium_ore","quantity":4750},{"item_id":"tungsten_ore","quantity":11800}]